top of page
Heathrow Airport
Details
The project involved the construction and provision of structured cabling and data network connections to the terminal as part of a wide upgrade to the area.
The contract was worth over £9 million and includes the installation of 24 000 outlets, 200 km of fibre-optic cabling and 700 cabinets to enable the airport operating system and specialist systems to operate over a common infrastructure.
From 2012 to 2014 CostPro were engaged to provide the Commercial Management of the 'End Devices' Contract (with a Contract Sum of circa £3.5m)
Year
Client
Sector
Service
2012
NG Bailey
Aviation
Quantity Surveying
bottom of page