Transmission Stations
Details
The project was based in Alberta, Canada.
Siemens were employed to connect the oil rich and energy producing oil fields in the north of Alberta with the high consuming south, two 500kV transmission lines were built over several hundred kilometres. To connect the transmission lines to their producers and consumers, four HVDC Substations were built, two outside of Calgary in southern Alberta and two near Edmonton in the north.
We were engaged from 2014 to 2017 to provide the Contract/Commercial Management of the Eastern Alberta Transmission Line (with a Contract Value of circa $500million). This inevitably lead to managing a number of disputes, 4 of which went to (International) Arbitration.